10,000 kg Grease Tank Solution
Date: April 2022
Report By: Mark Drayton
Early 2022 IRS was commissioned by a client to design and build a custom 10,000kg Grease Tank Solution.
The Client was very specific about their needs:
The discharge end consisted of:
Load Cell control and communications system.
The system is fitted with a sim card for real data monitoring and transfer back to the control room and the supplier.
A very difficult lift for the Wilsons Cranes boys. Its reassuring to watch their expertise come to the fore when getting a high lift through our workshop low roller door.