10,000 kg Grease Tank Solution

Date: April 2022

Report By: Mark Drayton

Early 2022 IRS was commissioned by a client to design and build a custom 10,000kg Grease Tank Solution.

10000 kg Grease Tank 1

The Client was very specific about their needs:

1.10,000kg capacity
2.28kg Flow Rate
3.Follower plate
4.Overfill protection
5.Heater - Thermostat controlled
6.Load Cells – Sim Card for data transfer
7.Internal pressure relief
8.Side mounted level gauge
9.Auto Pressure Vent
10.Fill and discharge grease filtration at 200µ
100000 kg Grease Tank 2
The grease fill point incorporated the fill filter and overfill shut-off valve.
1000 discharge end

The discharge end consisted of:

1.26:1 Grease pump
2.Pressure relief valve
3.Pressure venting valve 
4.Air service units
5.Discharge grease filter
10000 Grease Tank Grease Heater
Load cells and thermostatic controlled grease heater
10000 Grease Tank Load cell control and communications system

Load Cell control and communications system. 

The system is fitted with a sim card for real data monitoring and transfer back to the control room and the supplier.  

10000 Grease tank Workshop Lift 1 10000 Grease tank Workshop Lift 2. 

A very difficult lift for the Wilsons Cranes boys. Its reassuring to watch their expertise come to the fore when getting a high lift through our workshop low roller door. 

 

   All Case Studies

Case Studies

10,000 kg Grease Tank Solution Learn More 10,000 kg Grease Tank Solution

In early 2022 IRS was commissioned by a client to design and build a custom 10,000kg Grease Tank Solution. Features included: Overfill protection, Heater - Thermostat controlled, Sim Card for data transfer, Internal pressure relief and much more.

Underground 30,000 Litre Fuel Tank Module Learn More Underground 30,000 Litre Fuel Tank Module

Integrated Reliability Solutions was commissioned to design and build a 30,000 litre underground refuelling solution for a client in May 2022. 

Water Cannon Repair Learn More Water Cannon Repair

Integrated Reliability Solutions were approached by one of the Hunter Valley coal mines to inspect and come up with a suitable repair for the leaking water cannons. On inspection of the water cannon, it was noted that a number of components had worn due to lack of lubrication which allowed the water to leak when not in use.

Breather and Sampling Point Audit - Nth Queensland Learn More Breather and Sampling Point Audit - Nth Queensland

Glencore site Collinsville CHPP had requested that we undertake an audit on their current Breather and Sampling Points, to identify opportunities to improve the cleanliness of the air entering the compartments, oil and the accuracy and process of taking oil samples. 

MagnaDrive saves Plant Feed Conveyor Learn More MagnaDrive saves Plant Feed Conveyor

On the 4th of November 2007, the plant feed conveyor failed to start after the operator attempted to restart operations following a plant stoppage.

MagnaDrive Coupling Vibration Success Learn More MagnaDrive Coupling Vibration Success

Nothwestern U.S. Forest Products Company uses MagnaDrive MagnaGuard Econimizer to eliminate vibration.

MagnaDrive Coupling Screw Pump Learn More MagnaDrive Coupling Screw Pump

City of Eugene, Oregon – Wastewater Division – MagnaDrive Magnetic Coupling on Archimedean Screw Pump

MagnaDrive Coupling Chilled Water Pump Learn More MagnaDrive Coupling Chilled Water Pump

Washington Mutual Tower in Seattle, Washington Replaces Flexible Coupling with MagnaDrive ASD

MagnaDrive Coupling Air Preheater Learn More MagnaDrive Coupling Air Preheater

Minnesota Power was experiencing vibration problems on their Air Pre-Heaters. In an effort to correct this problem, Minnesota Power implemented a preventative maintenance procedure that required all couplings to be re-greased during every outage.

Hose Down Pump Learn More Hose Down Pump

The Magnadrive Adjustable Speed Drive Coupling (ASD) was installed on the Hose Down Pump at South Walker Creek CHPP on the 4th October 2007.

Bearing Skidding Learn More Bearing Skidding

Over the last three years IRS has been monitoring motor bearings displaying various stages of fatigue.

Electric Motor Bearing Defects Learn More Electric Motor Bearing Defects

The site was experiencing a high frequency of electric motor bearing faults. Condition monitoring reports had identified specific motors as manifesting bearing defects and had suggested that a “lack of lubricant” was a significant factor contributing to the defects.

Grease Contamination Learn More Grease Contamination

Over the course of several months, site maintenance personnel observed that lubrication system components were failing at a rate higher then what would normally be expected.

Get in touch to discuss your specific needs. Call now!

+61 (0)2 4903 8900
or Contact Us